EasyManua.ls Logo

Lexus LX - Page 546

Lexus LX
560 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
b. Install the clamp and connect the pressure feed tube (return tube side) to the
power steering link.
c. Using a union nut wrench, connect the pressure feed tube (pressure feed tube
side) to the power steering link.
Torque:
without union nut wrench:
44 N*m{ 449 kgf*cm , 32 ft.*lbf }
with union nut wrench:
40 N*m{ 409 kgf*cm , 30 ft.*lbf }
HINT:
Use a torque wrench with a fulcrum length of 300 mm (11.8 in.).
This torque value is effective when union nut wrench is
perpendicular to the torque wrench.
5. INSTALL TIE ROD END SUB-ASSEMBLY LH
a. Align the matchmarks of the tie rod and rack end, and temporarily install the tie
rod with the lock nut.
HINT:
After adjusting toe-in, tighten the lock nut.
Torque:
82 N*m{ 836 kgf*cm , 60 ft.*lbf }
b. Check that length A is the same as the length measured previously.
6. INSTALL TIE ROD END SUB-ASSEMBLY RH
HINT:
Use the same procedures described for the RH side.
7. CONNECT TIE ROD END SUB-ASSEMBLY LH

Related product manuals