EasyManua.ls Logo

LG 55LV555H - Page 17

LG 55LV555H
41 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 17 -
5.6 PING Test
* For confirm works normally the LAN card through PING
TEST.
5.6.1 Adjustment Method (PCB Ass y Level)
1) Connecting the LAN to Ass y and then turn on the Power.
2) Press the ADJ Key in the adjustment remote controller.
3) Press the 11. ACAP PING TEST in EZ ADJUST menu to
check the Network works well.
5.6.2 Adjustment Method (Ass y Line Level)
1) Connecting the LAN port in SET to the PC which has the
PING Test program through a Cross LAN Cable. (PC LAN
IP setting : 12.12.2.3)
2) Launch the PING Test program and confirm the program
Setting. (Checking the TV s IP is set 12.12.2.2 in program.
Don t check the Modem.)
3) Press the Power Only Key in the adjustment remote
controller. (Setting the TV IP)
4) Click the RUN button of program, and then program
display OK or NG like a below picture.
* For clear the IP setting after the adjustment, press the
INSTOP button.
5.7 Option selection per country
5.7.1 Overview
Option selection is only done for models in Non-USA North
America due to rating
Applied model: LA05A Chassis applied None USA
model(CANADA, MEXICO)
5.7.2 Method
1) Press ADJ key on the Adj. R/C, then select Country
Group Meun
2) Depending on destination, select KR or US, then on the
lower Country option, select US, CA, MX. Selection is
done using +, - KEY
5.8 Tool Option selection
Method : Press Adj. key on the Adj. R/C, then select Tool
option.
5.9 hip-out mode check (In-stop)
After final inspection, press In-Stop key of the Adj. R/C and
check that the unit goes to Stand-by mode.
After final inspection, Always turn on the Mechanical S/W.
6. GND and Internal Pressure check
6.1. Method
1) GND & Internal Pressure auto-check preparation
- Check that Power Cord is fully inserted to the SET.
(If loose, re-insert)
2) Perform GND & Internal Pressure auto-check
- Unit fully inserted Power cord, Antenna cable and A/V
arrive to the auto-check process.
- Connect D-terminal to AV JACK TESTER
- Auto CONTROLLER(GWS103-4) ON
- Perform GND TEST
- If NG, Buzzer will sound to inform the operator.
- If OK, changeover to I/P check automatically.
(Remove CORD, A/V form AV JACK BOX)
- Perform I/P test
- If NG, Buzzer will sound to inform the operator.
- If OK, Good lamp will lit up and the stopper will allow the
pallet to move on to next process.
6.2. Checkpoint
TEST voltage
- GND: 1.5KV/min at 100mA
- SIGNAL: 3KV/min at 100mA
TEST time: 1 second
TEST POINT
- GND TEST = POWER CORD GND & SIGNAL CABLE
METAL GND
- Internal Pressure TEST = POWER CORD GND & LIVE &
NEUTRAL
LEAKAGE CURRENT: At 0.5mArms
LGE Internal Use OnlyCopyright LG Electronics. Inc. All right reserved.
Only for training and service purposes
Model Tool 1 Tool 2 Tool 3 Tool 4 Menu
32LV555H 18180 1576 35112 544
2 HDMI, CAN Tuner, 2 RCA
37LV555H 22276 1576 35112 544
2 HDMI, CAN Tuner, 2 RCA
42LV555H 26372 1576 35112 544
2 HDMI, CAN Tuner, 2 RCA
47LV555H 34564 1576 35112 544
2 HDMI, CAN Tuner, 2 RCA
55LV555H 46852 1576 35112 544
2 HDMI, CAN Tuner, 2 RCA

Other manuals for LG 55LV555H

Related product manuals