
Do you have a question about the LG AC Ez Touch PACEZA000 and is the answer not in the manual?
| Operating Voltage | 220-240 V | 
|---|---|
| Operating Frequency | 50 Hz | 
| Refrigerant | R32 | 
| Type | Split System | 
| Cooling Capacity | 12000 BTU/h | 
General safety advice for installation and use, covering unauthorized installation and potential dangers.
Precautions for safe installation, including wiring, placement, and fixing the product.
Guidelines for safe operation, covering power cables, water, liquids, and handling.
Safety measures for product handling, cleaning, storage, and disposal of materials.
Instructions for proper disposal of old appliances according to European directives.
Guidelines for the safe and environmentally sound disposal of waste batteries.
Identifies and describes the function of each part of the AC Ez Touch controller.
Check installation environment and assign unique addresses to connected equipment.
Install the AC Ez Touch and connect the RS-485 communication cable.
Connect network and other cables, then attach the power adapter.
Register connected equipment and configure group settings for control.
Verify basic control and set-up functions operate correctly.
Detailed steps for setting up the installation environment and assigning unique equipment addresses.
Assigning addresses to indoor units to avoid conflicts and ensure proper system composition.
Guidelines for connecting the RS485 communication cable, including BUS type and limitations.
Detailed procedure for physically installing the controller, including knockout structure removal.
Connecting power adapter and Ethernet cable to the controller unit.
Procedure for mounting the controller onto the wall plate and locking it in place.
Configuring the emergency stop function by connecting to the DI port.
Overview of the AC Ez Touch menu structure, including Home, Aircon, Vent, Heating, Schedule, Report, and Setting.
Details on access rights for general users, managers, and installers within the system.
A checklist of symptoms, checks, and actions to perform before calling for service.