REFRIGERANT DESIGN | 41
Refrigerant Piping Design & Layout Best Practices
Piping Connection
Single Zone Art Cool Premier Connections
Pipe Connection for a Single Zone System
1. Remove the connection cover from the unit by loosening
the fastening screw (Figure 21).
2. Align the center of the refrigerant pipe and correspond-
ing connection as shown in Figure 22 and tighten the
flare nut by hand.
3. Tighten the flare nut with a torque wrench until the
wrench clicks. Follow the guidelines as outline in Table
14 for the amount of torque to use.
When tightening the are nut with torque wrench, ensure
the direction for tightening follows the arrow on the wrench.
Figure 21: Heat Pump Outdoor Unit Removal of Connection Cover
Figure 22: Heat Pump Outdoor Unit Piping Connection
INSTALLATION & LAYOUT BEST PRACTICES
Connection cover
Outdoor unit
Gas side piping
(Bigger diameter)
Liquid side piping
(Smaller diameter)
Torque wrench
Outside Diameter
(Inches)
Torque
(Lbs.-ft)
1/4 13-18
3/8 24.6-30.4
1/2 39.8-47.7
5/8 45.6-59.3
3/4 71.6-87.5
Table 14: Torque Wrench Tightening