Do you have a question about the LG ARUM192DTE5 and is the answer not in the manual?
Imminent hazardous situation leading to death or serious injury.
Guidelines for connecting pipes and choosing routes.
General electrical safety warnings and installation guidelines.
Procedure for performing leak and pressure tests on the system.
Steps for evacuating the refrigerant system using vacuum pumps.
Guide to configuring various optional modes via DIP switches.
Procedure for performing the Integrated Test Run.
Procedure for running system self-diagnostics.
Steps for automatically addressing indoor units.
Function to automatically set pipe connections via auto addressing.
Procedure for manual pipe detection addressing.
Adjusting fan speed for ductwork external static pressure.
Overview of LG VRF system error codes and levels.
Steps for preparing the refrigerant circuit before commissioning.
Imminent hazardous situation leading to death or serious injury.
Guidelines for connecting pipes and choosing routes.
General electrical safety warnings and installation guidelines.
Procedure for performing leak and pressure tests on the system.
Steps for evacuating the refrigerant system using vacuum pumps.
Guide to configuring various optional modes via DIP switches.
Procedure for performing the Integrated Test Run.
Procedure for running system self-diagnostics.
Steps for automatically addressing indoor units.
Function to automatically set pipe connections via auto addressing.
Procedure for manual pipe detection addressing.
Adjusting fan speed for ductwork external static pressure.
Overview of LG VRF system error codes and levels.
Steps for preparing the refrigerant circuit before commissioning.
| Category | Air Conditioner |
|---|---|
| Power Supply | 220-240V, 50Hz |
| Refrigerant | R410A |
| Model | ARUM192DTE5 |
| Cooling Capacity | 5.3 kW |
| Heating Capacity | 6.0 kW |











