EasyManua.ls Logo

LG AS-H0966KA2 - Pumping down

LG AS-H0966KA2
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44 Room Air Conditioner
Troubleshooting Guide
Procedure
(1) Confirm that both the 2-way and 3-way valves
are set to the open position.
Remove the valve stem caps and confirm that
the valve stems are in the raised position.
Be sure to use a hexagonal wrench to operate
the valve stems.
(2) Operate the unit for 10 to 15 minutes.
(3) Stop operation and wait for 3 minutes, then
connect the charge set to the service port of
the 3-way valve.
Connect the charge hose with the push pin to
the service port.
(4) Air purging of the charge hose.
Open the low-pressure valve on the charge set
slightly to air purge from the charge hose.
(5) Set the 2-way valve to the closed position.
(6) Operate the air conditioner at the cooling
cycle and stop it when the gauge indicates
1kg/cm
2
g.
(7) Immediately set the 3-way valve to the closed
position.
Do this quickly so that the gauge ends up indi-
cating 3 to 5kg/cm
2
g.
(8) Disconnect the charge set, and mount the 2-
way and 3-way valvesstemnutsandtheser-
vice port nut.
Use torque wrench to tighten the service port
nut to a torque of 1.8 kg.m.
Be sure to check for gas leakage.
Lo
Closed
Purge the air
Outdoor unit
Indoor unit
Liquid side
Gas side
CLOSE
Open
2-Way
valve
3-Way
valve
CLOSE
Pumping Down
Do not use the existing charge set for R-22.
It is necessary to use new charge set for R-410A.
The pressure of R-410A is 1.6 times higher than
that of R-22. Thus, the high pressure side gauge of
charge set should be used higher pressure gauge
of 50kg/cm2 range.

Other manuals for LG AS-H0966KA2

Related product manuals