EasyManuals Logo

LG AS-H096QGA2/QNA2 User Manual

LG AS-H096QGA2/QNA2
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #19 background imageLoading...
Page #19 background image
Service Manual 19
Installation
Tighten the flare nut with a wrench.
When extending the drain hose at the indoor unit,
install the drain pipe.
5. Wrap the insulation material around the con-
necting portion.
Overlap the connection pipe insulation material
and the indoor unit pipe insulation material. Bind
them together with vinyl tape so that there is no
gap.
Wrap the area which accommodates the rear pip-
ing housing section with vinyl tape.
Bundle the piping and drain hose together by
wrapping them with vinyl tape for enough to cover
where they fit into the rear piping housing section.
For left rear piping
1. Route the indoor tubing and the drain hose to
the required piping hole position.
2. Insert the piping, drain hose, and the connecting
cable into the piping hole.
mm inch kg
.
m
Ø6.35 1/4 1.8
Ø9.52 3/8 4.2
Ø12.7 1/2 5.5
Ø15.88 5/8 6.6
Ø19.05 3/4 6.6
Outside diameter Torque
Wrench
Indoor unit tubing
Open-end wrench (fixed)
Connection pipe
Flare nut
Vinyl tape(narrow)
Adhesive
Drain pipe
Indoor unit drain hose
Plastic bands
Insulation material
Vinyl tape(narrow)
Connection
pipe
Connecting cable
Vinyl tape
(wide)
Wrap with vinyl tape
Indoor
unit pipe
Pipe
Drain hose
Connecting
cable
Drain pipe
Connecting cable

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LG AS-H096QGA2/QNA2 and is the answer not in the manual?

LG AS-H096QGA2/QNA2 Specifications

General IconGeneral
BrandLG
ModelAS-H096QGA2/QNA2
CategoryAir Conditioner
LanguageEnglish

Related product manuals