2. Pump Down
Setting Procedure
1) Set the DIP Switch as follow after shutting the power source down.
2) Reset the power.
3) Red LED and Green LED of PCB lights during work.
(The indoor unit is operated by force.)
4) If operation is done, Red LED will be turned off.
If operation is not done normally, Red LED will blink.
5) Close the Liquid valve only after green LED turned off (7 minutes from the start of the machine).
Then close the gas valve after Green LED on.
UUB1, UUC1
UUD1, UUD3
1234565

Other manuals for LG CL18F

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LG CL18F and is the answer not in the manual?

LG CL18F Specifications

General IconGeneral
BrandLG
ModelCL18F
CategoryAir Conditioner
LanguageEnglish

Related product manuals