EasyManua.ls Logo

LG CordZero A91 Series - Appliance Assembly

LG CordZero A91 Series
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14 INSTALLATION
7 Plug the power cord into the power outlet.
Using Double-Sided Tape to Secure the
Appliance
1 Use the double-sided tape a to attach the
wall anchoring block b to the charging
station.
Remove the center section of double-sided
tape before attaching it to the wall
anchoring block.
2 Attach the second piece of double-sided tape
to the other side of the wall anchoring block
to secure it to the wall.
Do not use double-sided tape on wallpaper.
Compact Installation
For safety and convenience, install the charging
station using the self-standing or wall-mounted
installation methods. If you choose not to install
the charging station, place it on a level floor for
charging or storage.
1 Connect the power adapter to the port on the
back of the charging station.
2 Place the charging station on a hard and level
floor.
3 Separate the extension pipe and nozzle from
the product body before charging or storing
the appliance.
4 Plug the power cord into the power outlet.
CAUTION
Leaving the appliance on a level floor for a long
time with the extension pipe and nozzle
attached may damage the appliance.
Assembling the Appliance
Follow these steps to safely assemble the
appliance.
1 Firmly attach the extension pipe c, nozzle d,
or tool onto the product body a.
To detach the extension pipe, press the
extension pipe release button
b.
2 Put the product body on the charging station.
•See Charging the Battery for instructions
on installing and charging the battery.

Related product manuals