EasyManua.ls Logo

LG DL 740 E Series - Final Installation Check

LG DL 740 E Series
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29INSTALLATION
ENGLISH
8 Reinstall the terminal block access cover.
a White Wire from Dryer Harness
b Hot Leads of Power Cord (Black and Red)
c Neutral Wire (White)
d External Ground Wire (if required by local
codes)
e Ground Screw
Three-Wire Direct Wire
1 Remove 3.5 inches (8.9 cm) of the outer
covering from the wire. Strip 1 inch (2.5 cm)
insulation from each wire. Bend the ends of
the three wires into a hook shape.
2 Remove the terminal block access cover on
the upper back of the appliance.
3 Install UL-listed strain relief into the power
cord through-hole.
4 Thread the 3-wire, #10 AWG minimum copper
conductor power cable prepared in step 1
through the strain relief.
a Terminal block
b UL-listed strain relief
c UL-listed 3-wire power cord
5 Attach the two hot leads (black and red) of the
power cord to the outer terminal block
screws.
6 Attach the neutral (white) wire to the center
terminal block screw.
7 Connect the external ground (if required by
local codes) to the green ground screw.
8 Tighten all screws securely.
9 Reinstall the terminal block access cover.
a Hot lead (black and red)
b Neutral wire (white)
c External ground wire (if required by local
codes)
d Wire from the appliance harness
e Ground screw (green)
Final Installation Check
Once you have completed the installation of the
dryer and it is in its final location, confirm proper
operation with the following tests.
A 3-wire connection is NOT
permitted on new construction after
January 1, 1996.
A UL-listed strain relief is required.
Use UL-listed 3-wire, #10 AWG minimum
copper conductor cable. Allow at least 5 ft. (1.5
m) length to allow for removal and installation
of dryer.
1’’ (2.5 cm)

Related product manuals