EasyManua.ls Logo

LG DLEX3700VSP - Page 25

LG DLEX3700VSP
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25 INSTALLATION
ENGLISH
Ground Screw
White Wire from Dryer
harness
Hot (Red)
Three-Wire Direct Wire
A 3-wire connection is NOT permitted
on new construction after January 1,
1996.
A UL-listed strain relief is required.
Use UL-listed 3-wire, #10 AWG-
minimum copper conductor cable.
Allow at least 5 ft. (1.5 m) length to
allow for removal and installation of
dryer.
Remove 3.5-inch (8.9 cm) of the outer covering
1
from the wire. Strip 1 inch (2.5 cm) insulation
from each wire. Bend the ends of the three wires
into a hook shape.
1" (2.5 cm)
Remove the terminal block access cover on the
2
upper back of the dryer.
Install a UL-listed strain relief into the power
3
cord through-hole.
Thread the 3-wire, #10 AWG-minimum copper
4
conductor power cable prepared in step 1
through the strain relief.
Terminal Block
UL-Listed Strain Relief
UL-Listed 3-Wire Power
Cord
Attach the two hot leads (black and red) of the
power cord to the outer terminal block screws.
6
Attach the neutral (white) wire to the center
terminal block screw.
7
Connect the external ground (if required by local
codes) to the green ground screw.
8
Tighten all screws securely.
9
Reinstall the terminal block access cover.
Hot (Black) Neutral (White)
External Ground Wire (If
required by local codes)
5

Table of Contents

Related product manuals