EasyManua.ls Logo

LG LB-H306GSS0 User Manual

LG LB-H306GSS0
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
ENGLISH
êìëëäàâ üáõä
LG Concealed Duct
Air Conditioner
INSTALLATION MANUAL
LG
IMPORTANT
• Please read this installation manual completely before
installing the product.
• When the power cord is damaged, replacement work shall
be performed by authorized personnel only.
• Installation work must be performed in accordance with
the national wiring standards by authorized personnel
only.
• Please retain this installation manual for future reference
after reading it thoroughly.
Question and Answer IconNeed help?

Do you have a question about the LG LB-H306GSS0 and is the answer not in the manual?

LG LB-H306GSS0 Specifications

General IconGeneral
BrandLG
ModelLB-H306GSS0
CategoryAir Conditioner
LanguageEnglish

Summary

Safety Precautions

General Installation Safety

Covers basic installation safety like circuit breakers and grounding.

Electrical Work Safety

Emphasizes using qualified electricians and avoiding unauthorized repairs.

Unit Installation Location and Piping

Selecting the Best Location

Guides on choosing optimal locations for indoor and outdoor units based on conditions.

Piping Length and Elevation Limits

Specifies maximum allowed piping length and elevation difference between units.

Indoor Unit Installation

Drain Piping and Insulation

Unit and Drain Piping Gradient

Instructions on ensuring proper downward slope for unit and drain piping to prevent water issues.

Refrigerant Piping Procedures

Pipe Preparation and Flaring

Covers cutting, reaming, nut placement, and flaring of pipes for secure connections.

Pipe Bending and Brazing

Guides on bending pipes and brazing techniques for refrigerant lines.

Electrical Connections

Indoor Unit Cable Connection

Details how to connect electrical cables to the indoor unit's control board.

Air Purging and Evacuation

Preparation and Leakage Test

Covers system preparation and the procedure for performing a leakage test with nitrogen gas.

Evacuation and System Finishing

Details the vacuum pump evacuation process and final valve operations.

ESP Adjustment Guide

Related product manuals