EasyManuals Logo

LG LS-Q076BBG User Manual

LG LS-Q076BBG
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #41 background imageLoading...
Page #41 background image
2. Pumping down
Procedure
(1) Confirm that both the 2-way and 3-way valves
are set to the open position.
Remove the valve stem caps and confirm that
the valve stems are in the raised position.
Be sure to use a hexagonal wrench to operate
the valve stems.
(2) Operate the unit for 10 to 15 minutes.
(3) Stop operation and wait for 3 minutes, then
connect the charge set to the service port of
the 3-way valve.
Connect the charge hose with the push pin to
the service port.
(4) Air purging of the charge hose.
Open the low-pressure valve on the charge set
slightly to air purge from the charge hose.
(5) Set the 2-way valve to the closed position.
(6) Operate the air conditioner at the cooling
cycle and stop it when the gauge indicates
1kg/cm
2
g.
(7) Immediately set the 3-way valve to the closed
position.
Do this quickly so that the gauge ends up indi-
cating 3 to 5kg/cm
2
g.
(8) Disconnect the charge set, and mount the 2-
way and 3-way valves stem nuts and the ser-
vice port nut.
Use torque wrench to tighten the service port
nut to a torque of 1.8 kg.m.
Be sure to check for gas leakage.
Lo
Closed
Purge the air
Outdoor unit
Indoor unit
Liquid side
Gas side
CLOSE
Open
2-Way
valve
3-Way
valve
CLOSE
-41-

Other manuals for LG LS-Q076BBG

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LG LS-Q076BBG and is the answer not in the manual?

LG LS-Q076BBG Specifications

General IconGeneral
BrandLG
ModelLS-Q076BBG
CategoryAir Conditioner
LanguageEnglish

Related product manuals