EasyManua.ls Logo

LG R22AWN-NC9 - Page 16

LG R22AWN-NC9
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16 Air Conditioner
Installation
Wrap the insulation material around the
connecting portion.
1. Overlap the connection pipe insulation
material and the indoor unit pipe insulation
material. Bind them together with vinyl tape
so that there may be no gap.
2. Wrap the area which accommodates the rear
piping housing section with vinyl tape.
3. Bundle the piping and drain hose together by
wrapping them with vinyl tape sufficient
enough to cover where they fit into the rear
piping housing section.
Finishing the indoor unit installation
1.
Mount the tubing holder in the original positon.
2. Ensure that the hooks are properly seated on
the installation plate by moving it left and
right.
3. Press the lower left and right sides of the unit
against the installation plate until the hooks
engage into their slots (clicking sound).
4. Finish the assembly by screwing the unit to
the installation plate by using two pieces of
type "C" screws. And assemble a chassis
cover.
Insulation material
Vinyl tape(narrow)
Connection pipe
Connecting cable
Vinyl tape (wide)
Wrap with vinyl tape
Indoor unit pipe
Pipe
Wrap with vinyl tape
Drain hose
Pipe
Vinyl tape(wide)
Type 'C' screw

Other manuals for LG R22AWN-NC9

Related product manuals