23
4 INSTALLATION
Discharging and handling the spiral mixer
The mixer discharging and handling operations must be performed using a lift truck, by qualified personnel.
Subsequently remove the machine from the packaging by lifting it with a hoist.
Assembling the wheels
Once the machine is unpacked, proceed as follows:
1. Lay the machine on the side;
2. Unscrew the existing feet;
3. Fit the wheels (front with brake, rear without brake).
Positioning of the mixer
The mixer installation operations must be performed by qualified personnel
according to the local, national and European regulations.
Make sure the floor or bearing surface is levelled.
After removing the machine from the special packaging, place it
in the location envisaged, taking into account the minimum safety distances from
the
walls and/or other equipment to facilitate the use and cleaning operations.
Please find on the side a diagram indicating how to position the machine.
Remove any polystyrene protections and protective film; avoid using tools
that can damage the surfaces.