EasyManua.ls Logo

Lifetime 90240 - Page 45

Lifetime 90240
73 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
47
TOOLS AND HARDWARE REQUIRED
X SECTION 6 (CONTINUED)
Place the Square Plugs (EIG) into the ends of both Deck Tubes (CBU). Attach the Deck Tubes to the Hand Rails using
the Hardware indicated.
6.4
BTS (x8)
EIG (x4)
DXY (x8)
CBS
CBT
CBT
BTS
CBU
BTS
BTS
BTS
CBS
CBS
EIG
CBU (x2)
EIG
DXY
DXY DXY
DXY
!
Repeat this step for the Cargo Net side (CBW) of the
assembly.
WARNING
Use extreme caution when standing on ladders to
perform assembly steps. Follow all warnings and
cautions on the ladder. Failure to follow all of these
instructions and warnings could lead to serious
personal injury or property damage.
!
(1)
3/16 in/po (≈5 mm)
(2)

Related product manuals