EasyManua.ls Logo

Lifetime 90913 - Page 92

Lifetime 90913
132 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
92
TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS / INSTRUMENTAL Y HERRAJE REQUERIDOS
X SECTION 4 (CONTINUED) / SECTION 4 (SUITE) / SECCIÓN 4 (CONTINUACIÓN)
4.7
DXY
BTSBTS
3/16 in/po (≈5 mm)
(2)
(1)
(1)
FJD (x2)
4.6
Stand up the Roof Frame and place the fi rst
Roof Panel (FEP) against the Roof Trusses (FAV)
and Roof Support Tubes (BYY).
Mettre le cadre du toit vertical et placer le
premier panneau de toit (FEP) contre les fermes
de toit (FAV) et les tubes de support de toit (BYY).
Ponga el armazón de tejado vertical y
coloque el primer panel de tejado (FEP) contra
las cerchas de tejado (FAV) y los tubos de soporte
de tejado (BYY).
FEP
Secure the lower Roof Panels (FEP) to the Roof Support Tubes (BYY) with the hardware indicated.
• Fixer les panneaux de toit inférieurs (FEP) aux tubes de support de toit (BYY) à l’aide de la quincaillerie indiquée.
• Sujete los paneles de tejado inferiores (FEP) a los tubos de soporte del tejado (BYY) usando el herraje indicado.
BTS (x2)
FEP
FEP
DXY
FJD
FJD
BYY
BYY
BYYBYY
DXY (x2)
Exterior View / Vue extérieure / Vista exterior
Interior View / Vue intérieure / Vista interior

Table of Contents

Related product manuals