Do you have a question about the Lindsay GROWSMART and is the answer not in the manual?
Explains hazard severity levels, personal safety precautions, and notices.
Details lock-out/tag-out, power disconnects, electrical connections, and shock prevention.
Covers safe operation, maintenance, inspection, and system integrity.
Addresses safety during repairs, lifting, dismantling, and emergency preparedness.
Lists specific warnings for VRI Power Supply and Main Controller assemblies.
Details FCC and Industry Canada compliance for VRI components.
Lists specifications for Standard and High Powered Node Assemblies.
Provides electrical and environmental specifications for VRI Controller and Power Supply.
Lists various international and regional compliance standards met by VRI components.
Provides physical dimensions and weight for the VRI Power Supply Assembly.
Lists physical dimensions and weight for the Standard VRI Node Assembly.
Details physical dimensions and weight for the VRI Main Control Panel.
Defines VRI and its purpose in irrigation systems.
Explains the operational principles of VRI in precision irrigation.
Describes three configurations for installing VRI valves with flow direction emphasis.
Covers mounting nodes, cable routing, and GPS unit placement.
Illustrates the wiring connections for the VRI Node board, including valve and power terminals.
Details installing the GPS receiver and configuring DIP switches for radio channels and GPS activation.
Explains the three parts of the VRI valve plugs and their assembly.
Guides on positioning the power supply and adjusting its voltage output.
Illustrates the wiring connections from three-phase power to the 24V DC power supply.
Lists and describes the parts required for the VRI Power Supply assembly.
Details wiring connections to the Standard Tower Panel terminal block from the VRI power supply.
Lists hardware and describes the assembly of brackets for mounting the VRI main panel.
Illustrates factory and field wiring for the VRI control panel within the main enclosure.
Details wiring connections for the VRI BASIC Control Panel, including end gun and safety circuits.
Illustrates wiring connections for VRI VISION/BOSS Control Panels, including USB and LAN ports.
Provides wiring diagrams for VRI in pivot control, specifically for non-Zimmatic main panels.
Explains the functions of the Test Tab for system diagnostics and valve testing.
Describes output/input configuration and console window options.
Covers general settings, FieldNET, I/O, node, log file, units, and sprinkler settings.
Explains how to import predefined settings or export current settings.
Covers initial checks, safety cautions, and powering up the system and nodes.
Details testing valve operation and the speed control circuit.
Describes the final step of creating and installing a custom VRI plan.
Diagnoses problems with nodes not connecting, incorrect MAC addresses, and driver issues.
Addresses issues with valve pulsing, reversed operation, and GPS signal reception.
Provides specific node wiring instructions for systems installed in New Zealand.
Details wireless connection setup using Ubiquiti NanoStations for New Zealand.
Covers wired connections and GSM module installation for remote irrigation systems.
Lists changes made to the manual across different revisions with dates and ECN numbers.
| Category | Irrigation System |
|---|---|
| Features | Remote monitoring and control, automated adjustments based on weather data |
| Connectivity | Cellular |
| Power Source | Solar |
| Manufacturer | Lindsay Corporation |