Do you have a question about the Lochinvar FTxl 400 and is the answer not in the manual?
Requirements for air openings to ensure adequate ventilation for the boiler room.
General considerations for routing vent and air piping.
Methods to avoid contaminants in the combustion air supply.
Details requirements for combustion and ventilation air for appliances in an equipment room.
Procedures for converting the boiler for natural gas or propane.
Instructions for sidewall venting configurations.
Instructions for vertical venting configurations.
Detailed instructions for installing vent and combustion air piping systems.
Procedures for installing vent and air piping using specific materials.
Instructions for terminating sidewall vent and air pipes.
Specific instructions for installing optional concentric sidewall vents.
Instructions for terminating vertical vent and air pipes.
Specific instructions for installing optional concentric vertical vents.
Instructions for using existing venting systems as a chase for concentric venting.
Information on the boiler's low water cutoff safety feature.
Instructions for connecting the boiler to the gas supply.
Specifics for natural gas connections, sizing, and pressure requirements.
Specifics for propane gas connections, sizing, and pressure requirements.
Procedures for verifying the gas supply to the boiler.
Procedures for filling the boiler with water and checking its quality.
Steps for filling the system with water and testing for leaks.
How to remove air from the hydronic system.
Verifying thermostat wiring and connections.
A checklist of critical checks before initiating boiler operation.
General checks of the boiler and associated piping.
Verifying for leaks in the water piping system.
Inspecting vent and air piping for integrity.
Procedures for checking the gas piping connections.
Procedures for analyzing burner performance and combustion.
Configuring boiler operation for space heating.
Configuring the boiler for domestic hot water heating.
Describes safety features related to temperature and voltage.
How high limit settings protect the boiler.
How the boiler prevents operation with low water.
Wiring and controlling multiple boilers together.
Detailed step-by-step process of boiler operation during a call for heat.
Tasks for qualified service technicians during annual startup.
How to handle and correct reported issues.
Verifying all piping for leaks and their correction.
Inspecting the flue vent and air piping for issues.
Verifying the proper installation and operation of the water system.
Inspecting and testing the boiler's relief valve.
Executing the startup procedure and checks.
Inspecting the burner flame for proper operation.
Ensuring the flame signal is within acceptable limits.