Do you have a question about the Lofrans PROJECT 1000 and is the answer not in the manual?
Crucial safety guidelines for operating the windlass and preventing accidents.
Specifies minimum electrical system requirements for windlass operation.
Outlines essential conditions for proper and safe windlass installation.
Step-by-step instructions for installing the windlass on the vessel.
Guides on performing initial functional tests after installation.
Instructions for using the clutch on low profile and standard models.
Procedures for lowering and raising the anchor using the electric motor.
Guidance on post-anchoring, navigation safety, and drum use.
Procedure for operating the windlass in manual emergency mode.
Recommended maintenance schedule for optimal windlass performance.
Exploded view and parts breakdown for the finger kit.
Detailed exploded view of the Project 1000 windlass components.
Crucial safety guidelines for operating the windlass and preventing accidents.
Specifies minimum electrical system requirements for windlass operation.
Outlines essential conditions for proper and safe windlass installation.
Step-by-step instructions for installing the windlass on the vessel.
Guides on performing initial functional tests after installation.
Instructions for using the clutch on low profile and standard models.
Procedures for lowering and raising the anchor using the electric motor.
Guidance on post-anchoring, navigation safety, and drum use.
Procedure for operating the windlass in manual emergency mode.
Recommended maintenance schedule for optimal windlass performance.
Exploded view and parts breakdown for the finger kit.
Detailed exploded view of the Project 1000 windlass components.
| Voltage | 12V / 24V |
|---|---|
| Motor Power | 1000 W |
| Model | PROJECT 1000 |
| Manufacturer | Lofrans |
| Chain Size | 6 mm DIN766 |
| Rope Size | 12 mm |
| Type | Windlass |
| Drum Capacity | Not applicable |