EasyManua.ls Logo

Loring S15 Falcon - Page 6

Loring S15 Falcon
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
S15 Pre-Installation and Site Preparation Guide
Page 6 of 46
Loring Smart Roast Proprietary This document is controlled by
Document Control. By printing this document, it will become a “Reference” copy.
Users are responsible for verifying that it is the latest revision available.
1008236 Rev B
Receiving Shipment __________________________________________28
Shipping Notes ___________________________________________28
S15 Shipping Crate _______________________________________29
Lifting and Moving the Roaster_______________________________31
Next Steps __________________________________________________34
Site Preparation Checklist __________________________________34
Gas and Gas Supply __________________________________________35
Propane Fuel Installation Specications _______________________36
Natural Gas Installation Specications _________________________37
Installing the Vent Stack _______________________________________38
Vent Stack Congurations __________________________________40
Adjusting Roaster to the Vent Stack __________________________44
Manufacturer Contact Information _______________________________ 46

Related product manuals