S15 Pre-Installation and Site Preparation Guide
Page 6 of 46
Loring Smart Roast Proprietary – This document is controlled by
Document Control. By printing this document, it will become a “Reference” copy.
Users are responsible for verifying that it is the latest revision available.
1008236 Rev B
Receiving Shipment __________________________________________28
Shipping Notes ___________________________________________28
S15 Shipping Crate _______________________________________29
Lifting and Moving the Roaster_______________________________31
Next Steps __________________________________________________34
Site Preparation Checklist __________________________________34
Gas and Gas Supply __________________________________________35
Propane Fuel Installation Specications _______________________36
Natural Gas Installation Specications _________________________37
Installing the Vent Stack _______________________________________38
Vent Stack Congurations __________________________________40
Adjusting Roaster to the Vent Stack __________________________44
Manufacturer Contact Information _______________________________ 46