Assembly and Installation Guide
Loring S15 Falcon Coffee Roaster
TM
Question and Answer IconNeed help?

Do you have a question about the Loring Falcon S15 and is the answer not in the manual?

Loring Falcon S15 Specifications

General IconGeneral
BrandLoring
FuelNatural Gas or Propane
Steam Generator OutputNot applicable
Temperature RangeUp to 500°F (260°C)
ModelS15
CategoryCoffee Roaster
Cooking ModesRoasting
Control InterfaceTouchscreen

Summary

Notices and Safety

Document Versioning Information

Describes document control and versioning details for the manual.

Dangers, Warnings, and Cautions

Explains the meaning of signal words used for hazards.

Introduction

Audience

Defines the intended readers of the manual.

Additional Documentation

Lists other available documents for assembly and installation.

Component Identification

Major Components, Assembled

Identifies and illustrates the main parts of the roaster.

Back View, Components, As Shipped

Shows components from the back, especially fans and motors.

Preparation and Uncrating

Notes for Unpacking

Provides guidance on safely unpacking the roaster and its components.

Uncrating the Roaster

Details crate dimensions, weight, and item list for uncrating.

Roaster Assembly: Initial Steps

Attach Roaster Feet

Instructions on how to attach the roaster feet to the main unit.

Attach Vacuum Tube

Details the process of connecting the vacuum tube.

Attach the Cyclone

Explains how to reattach the cyclone to the roaster.

Attach Purge Gate Air Cylinder

Details installing the purge gate air cylinder.

Attach Gas Mixer Line

Instructions for connecting the gas mixer line.

Secure Cyclone Fasteners

Describes how to tighten fasteners for the cyclone connections.

Water Line and Cutoff Switch

Instructions for attaching water lines and high temperature cutoff switch.

Ignition and Thermocouple Installation

Connect the Ignition Wire

Explains connecting the ignition wire for spark ignition.

Burner Control Unit (BCU) Ignition

Details wiring for the BCU ignition system.

Direct Spark Ignition (DSI)

Details wiring for the DSI ignition system.

Install the Thermocouples

Guides the installation of thermocouples into the stack.

Final Assembly and Placement

Complete the Cyclone Installation

Final connections for the cyclone.

Attach Mini Cyclone

Instructions for attaching the mini cyclone.

Move Roaster to Final Location

Guidance on moving the assembled roaster to its intended site.

Tryer Handle

Information about the tryer component and its use.

System Setup and Connections

Adjust the Operator's Console

How to adjust the articulating arm of the operator's console.

Chaff Barrel and Roaster Feet

Describes chaff barrel installation and roaster feet for leveling.

Compressed Air Supply

Guidance on obtaining and preparing the compressed air supply.

Install the Roaster

Outlines tasks for final roaster installation and utility connections.

Air, Gas, and Water Connections

Details hookups for compressed air, natural gas/propane, and water.

Hot Air Exhaust Vent Connection

Instructions for connecting the hot air exhaust vent.

Cooling Air Exhaust Vent Connection

Instructions for connecting the cooling air exhaust vent.

Electrical and Network Connections

Details power cable inlet and local area network (LAN) inlet.

Post-Installation Procedures

Next Steps

Outlines actions after assembly, including scheduling commissioning.

Manufacturer Information

Contact Information

Provides contact details for Loring Smart Roast, Inc. and customer support.