S35 Assembly and Installation Guide
Document No. 1006863 Rev A Page 5
Cyclone Connections, Assembled ____________________________37
Loosen Gas Mixer
________________________________________38
Lift Cyclone Into Position
___________________________________39
Attach Cyclone to Circulation Fan Housing
_____________________40
Attach Cyclone to S-Duct
___________________________________41
Attach Purge Gate Air Cylinder
______________________________42
Attach Cyclone to Gas Mixer
________________________________43
Secure Cyclone Fasteners
__________________________________44
Install Stack and Stack Hat
_________________________________44
Install Cyclone, Part 2
_________________________________________47
Final Roaster Assembly
_______________________________________48
Attach Auto Hopper Blower
_________________________________48
Attach Mini Cyclone
_______________________________________50
Move Roaster to Final Location
______________________________52
Tryer Handle
_____________________________________________ 52
Chaff Barrel
_____________________________________________53
Compressed Air Supply
____________________________________53
Install the Roaster
____________________________________________54
Air, Water, and Gas Connections
_____________________________55
Hot Air Exhaust Vent Connection
_____________________________56
Cooling Air Exhaust Vent Connection__________________________57
Electrical and Network Connections___________________________58
Position Final Items
_______________________________________59
Next Steps
__________________________________________________60
Manufacturer Contact Information
_______________________________ 61