S35 Assembly and Installation Guide
Page 4 Document No. 1006863 Rev A
Contents
Introduction _________________________________________________ 6
Audience
_______________________________________________ 6
Additional Documentation
__________________________________ 6
Major Components, Assembled
______________________________ 7
Back View, Components, As Shipped
_________________________ 8
Notes for Unpacking
_______________________________________10
Uncrate the Roaster
__________________________________________11
Small Parts Box
__________________________________________12
Green Bean Hopper
_______________________________________13
Green Bean Cart
_________________________________________13
Chaff Barrel
_____________________________________________14
Vacuum Tube
____________________________________________14
S-Duct
_________________________________________________15
Mini Cyclone
_____________________________________________16
Checkpoint: Uncrating
_____________________________________17
Assemble the Roaster, Part 1
___________________________________18
Assembly Overview
_______________________________________18
Attach Roaster Feet
_______________________________________20
Attach Green Bean Hopper
_________________________________23
Attach Vacuum Tube
______________________________________26
Attach S-Duct to Inlet Air Opening
____________________________30
Attach the Cyclone, Part 1
_____________________________________33
Cyclone Prep
____________________________________________33
Remove Stack
___________________________________________34
Attach Cyclone Lifting Block
_________________________________35
Cyclone Connections, Exploded
_____________________________36