363-205-401 Conversions: DLP-506
Issue 7, March 1997 Page 5 of 6
14. After approximately 20 seconds, do
ADU
and
BCU FAIL
indicators go off?
If
YES,
then proceed to Step
21.
If
NO,
then continue with Step
15.
15. Replace
BCU
with
BCU
removed previously.
16. Remove
ADU
and check settings of switches on option switch
S1
per work
order and Steps
2
-
8
.
17. Are switch settings on option switch correct?
If
YES,
then continue with Step
18.
If
NO,
then proceed to Step
20.
18. Get another
ADU
and set switches on option switch
S1
according to work
order and Steps
2
-
8
.
19.
!
CAUTION:
Incorrectly set ADU option switches may result in immediate or future
loss of service or may introduce errors into the digital bitstream.
Insert
ADU
into
ADU
slot in bank being equipped. Proceed to Step
21.
Response: After approximately 20 seconds,
ADU
and
BCU FAIL
indica-
tors go off.
20. Correct setting of switches on option switch and repeat from Step
11.
21. Wait 10 minutes before doing this Step when converting to an FPC-AutoCut
configuration. Wait until the
PRV
goes off for a Mode 1 or Mode 2 conversion.
Remove
ADU
and set
CLEAR/NORM
option plug for
NORM
.
22. Reinstall
ADU
.