363-205-401 Power Up:
Issue 7, March 1997 Page 1 of 4
NTP-004
Add Battery String Equipment to J1C182BA Power
Shelf in Frame, 51, 80, or 90-Type Cabinet RT
DO ITEMS BELOW IN ORDER LISTED FOR DETAILS, GO TO
1.
NOTE:
This procedure provides steps for adding supporting
equipment (battery strings, rectifiers, battery chargers, and
BFUs) to J1C182BA power shelf. This procedure assumes
the following:
The procedures to initially equip the J1C182BA power
shelf has been done.
The outside cable pairs are not closed through to the
RT so that the RT is isolated from the digital and
derived lines.
The J1C182AB or J1C182AE dual channel bank
assembly has been installed in the frame or cabinet
enclosure.
The miscellaneous pair panel, protector connectors,
power shelf, fan shelves, and battery shelves (if
required) have been installed in the frame or cabinet
enclosure.
The acceptance Tab procedures in this volume have
been performed.
This procedure contains instructions concerning the installation of
the various supporting units into the RT assembly shelves, bat-
tery shelves (if required), and power shelf, and for verifying that
the units are operating properly.