363-205-401 Power Up:
Issue 7, March 1997 Page 1 of 4
NTP-005
Turn Up J1C182BB Bulk Power Shelf and Supporting
Equipment in RT Frame
DO ITEMS BELOW IN ORDER LISTED FOR DETAILS, GO TO
1.
NOTE:
This procedure assumes the following:
• The outside cable pairs are not closed through to the
RT so that the RT is isolated from the digital and
derived lines.
• The frame housing the RT has been installed.
• The J1C182AB or J1C182AE dual channel bank
assembly has been installed in the frame.
• The miscellaneous pair panel, protector connectors,
power shelf, fan shelves, and battery shelves (if
required) have been installed in the frame.
• The acceptance procedures in this volume have been
performed.
This procedure contains instructions concerning the installation of
the various supporting units into the RT assembly shelves, bat-
tery shelves (if required), and power shelf, and for verifying that
the units are operating properly.
2. Get Support Apparatus Listed:
• DMM (digital multimeter) with an accuracy of 1.0% and an
ac/dc input impedance of ≥ 1 megohm.
• One
AUA11( ) PCU
(power converter unit).