363-205-401 Power Up: NTP-004
Issue 7, March 1997 Page 3 of 4
DO ITEMS BELOW IN ORDER LISTED FOR DETAILS, GO TO
5.
NOTE:
Batteries must have been on charge for at least 48 hours
before testing with
197A BATTERY LOAD TEST SET
. If
batteries have just been put on charge, the remainder of this
procedure may be performed and batteries can be tested at
a later date.
DLP-504Perform test of RT batteries using
197A BATTERY LOAD TEST
SET
.
6.
NOTE:
One battery charger is required per battery string.
DLP-514Install
337A BATTERY CHARGER
s in Frame-type RT, 80-type
CSC (community service cabinet), 90-type cabinet
(ED-7C621-30, ED-97977-30, or ED-7C699-30), or 51-type
(ED-7C601-30) cabinet RT.
7. If adding AC rectifiers to an existing system, continue with Step
8
.
Otherwise, proceed to Step
9
.
DLP-5158. Install
336A RECTIFIER
s in power shelf.
DLP-5109. Install (if not previously installed) and check fuses in second
BFU
(bank fuse unit) in power shelf.
10. If powering a SLC Series 5 RT dual channel bank, continue with
Step
11
. Otherwise, proceed to Step
13
.
DLP-51111. Install and test
PCU
(power converter unit) in facility shelf.
12. Remove
PCU
. Repeat previous Step for each new dual channel
bank assembly.
13. Update records to indicate that RT supporting equipment has
been installed. When required, perform RT Turn Up procedures
for the appropriate Feature Package.