Madas RG/2MCS - 4.0 - MANUAL RESET; 5.0 - FIRST START-UP

Madas RG/2MCS
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ES FR
EN
IT
16
Madas Technical Manual - 5|5.2a - REV. 0 of
th
Apr 2019RG/2MCS - RG/2MBZ
piping
applicaon
discharge in open air
discharge in open air
1
2
3
6
5
7
8
4
internal thermal unit
non-hazardous venlated zone*
external roof
EXAMPLE 2 (RG/2MBZ)
1. Expansion joint/anti-vibration mount
2. Upstream ball valve
3. RG/2MBZ pressure regulator
4. Ball valve downstream of the regulator
* if the zone is ATEX classified follow the indications of 3.3
4.0 MANUAL RESET
Make sure that all valves and downstream taps are closed;
Unscrew the cap (11);
Lightly press the reset pin (29), wait a few moments for the pressure to balance and then fully press the reset pin (29);
Hold down the reset pin (29), slowly open the valve downstream of the regulator;
Release the reset pin (29);
Then tighten the cap (11) back in the initial position.
5.0 FIRST STARTUP
Before commissioning, verify that:
all of the instructions on the rating plate, including the direction of flow, are observed;
the holes of the dust caps (12) and (24) are not clogged (regulator and shut off);
IMPORTANT: The leak test of the piping must be performed without subjecting the diaphragm of the regulator
(therefore, the downstream pipe section) to a pressure higher than 300 mbar (for reinforced diaphragm 1.5 times
the regulator setting pressure). Use special manual gas closing devices to avoid damaging the regulator;
The pressurisation manoeuvre of the equipment must be carried out very slowly so as to avoid possible damage.
NOTE: under no circumstances should a blind cap be installed in place of dust caps (12) and (24) as the
regulator and/or the safety shut offs may not work;
Close the ball valve downstream of the regulator and partially open the downstream relief valve;
Slowly open the upstream shut-off devices;
Close the vent valve;
Proceed by manually resetting the regulator (see 4.0);
Close the downstream valve so as to close the regulator (the Pa value increases the SG value to fully close the obturator);
Check the tightness of the system seals and check the internal/external tightness of the regulator, of the relief valve and of
the external sensor tube, if applicable;
Slowly open the downstream valve and the shut-off valve;
Check the operation of the regulator.
5. Vent valve
6. MVS/1 relief valve
7. Low pressure gauge and relative button
8. High pressure gauge and relative button
Ø ext. min 8mm
Ø int. min 6mm
5 DN