Page 10 of 18 507388-01Issue 1504
OPERATION
Operaon of the unit is automac and will provide heang and
cooling depending on the seng of the thermostat.
Heang
1. Turn on main power supply.
2. Open manual gas shuto valve.
3. Set thermostat system to “HEAT”.
4. Set thermostat to temperature desired.
Cooling
1. Turn on main power supply.
2. Set thermostat system switch to “COOL”.
3. Set thermostat to temperature desired.
Heang Sequence of Operaon
1. Thermostat calls for heat.
2. Combuson blower starts and proper air ow is proven by
the pressure switch closing.
3. Blower connues to operate for 30 seconds prior to the
burners lighng.
4. Ignion control begins spark and opens gas valve. The
burners are lit. Ignion is proved through the ame sensor.
5. Circulang air blower starts 30 seconds aer the burners
light.
6. When the thermostat is sased, the burners and combuson
blower shut o.
7. Circulang air blower will shut o 120 seconds later.
If the burners should fail to ignite, the ignion control will try to
ignite the burners a total of three mes. Should the burners fail
to ignite within the three trials for ignion, the ignion control
will lock out for 1 hour before beginning another ignion cycle.
To reset the control, turn the thermostat down or o for 10
seconds and then set to desired seng. At this me, the ignion
sequence will try again.
Blower Control
The blower will start approximately 30 seconds after the
burners ignite and will stop approximately 120 seconds aer the
thermostat is sased. The me delay is preset at the factory
and ming can not be adjusted.
Cooling Sequence of operaon
When the thermostat system switch is set for “COOL”, the blower
will start 5 seconds aer the thermostat calls for cooling and will
stop 90 seconds aer the thermostat is sased.
Connuous Fan Operaon
Connuous operaon of the air handling blower will be obtained
if the thermostat fan switch is set to “ON”. With the thermostat
fan switch set to “AUTO”, the air handling blower will cycle
corresponding with the thermostat cycling.
To Shut Down Unit
For temporary or short periods of shutdown, set the thermostat
system switch to “OFF”. For a prolonged period of shutdown, set
the thermostat system switch to “OFF” and turn o the electrical
power supply and the gas supply to the unit.
The HWC8 burner & manifold assembly, combuson inducer
assembly, and ignition control board mounting are newly
designed for improved service access over previous models. Refer
to Figure 5 for heang cabinet component layout.
It is recommended that the furnace be inspected annually by a
qualied service person.
MAINTENANCE
ELECTRICAL SHOCK, FIRE OR EXPLOSION HAZARD
Failure to follow safety warnings exactly could result in
dangerous operation, Serious injury, death or property
damage.
Improper servicing could result in dangereous operaon,
Serious injury, death or property damage
• Before servicing. disconnect all electrical power to
furnace
• When servicing controls, label all wires prior to
disconnecting reconnect wires correctly.
• Any disassembly of components containing ue
or vent gases shall be done by a qualied service
agency.
• Verify proper operation after servicing.
WARNING