EasyManua.ls Logo

Major Science MP-300 - Maintenance

Default Icon
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
Err3; power
supply stops;
alarm sounds
Groundleak detection
- Check electrophoresis
system for earth leakage.
- Switch power on / off and
restart application
Err6; power
supply stops;
alarm sounds
Power supply is
overheating
- Turn off power supply
immediately and check that
there is adequate clearance
around the power supply for
even ventilation.
- If the power supply cannot be
restarted, disconnect the
power supply from the mains
outlet and contact Technical
Service
Err7; power
supply stops;
alarm sounds
Poor connection
between power cable
and power supply;
damaged power
cable or electrode
- Check power cables and
electrodes within the gel tank
A59; power
supply stops;
alarm sounds with
countdown to
zero: A58, A57
etc.
Countdown before
power supply restarts
- Ensure that electrophoresis
conditions for system are
correct, without
compromising personal
safety.
Maintenance
MP-300 Power Supply series only requires little maintenance to assure reliable
operation. The housing may be cleaned with a dry cloth.