SET-UP OPERATOR MANUAL NBT50
4-10 Published 03-23-2018 Control # 243-14
6. Install pin (3) that was removed from the stowage
bracket (4) to secure the mast to the jib boom.
7. Install the retaining clip (5)to secure pin to mast.
8. Route hoist cable in groove in sheave wheel and secure
with retaining pin (6).
CAUTION
Use caution to avoid pinch points while positioning mast.