EasyManua.ls Logo

MAPLE M-321 - Page 13

Default Icon
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
FILLING
When adding water for the first time, the hot tub should be filled through the
skimmer opening (helps to prevent air locks) using a standard garden hose, turning
the tap on slowly to prevent damage to the surface by a jerking hose connection.
Fill the hot tub to the recommended level, approximately just under the pillow.
CHECKING
Although your hot tub was thoroughly water-tested in the factory, some loosening
of fittings can occur during shipping. Before any decking, tiling or carpeting is
completed around the installation, fill and operate your hot tub to test for leaks (this
ensures easy access and inexpensive correction). Check all union connections and
plumbing for minor leaks. In the event of a leak, ensure all union connections and
pump plugs are tight and all O-rings/gaskets are in place.
STARTING
Before applying voltage to power-up your hot tub, it is very important that you
understand the sequence of events that occur when the system is activated in order
that the pump can be primed efficiently and damage to the system can be avoided.
Turn the main power “on” at your electrical panel.
Follow the control instructions for your particular model hot tub
.