EasyManua.ls Logo

Marco FILTRO SHUTTLE 5.6kW - User Manual

Default Icon
4 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
mar coO
FI LTROSHUTTLE
MAINTEtiANCE:
Marco macnines have been designed to give many years of trouble free service.
Marco Beverage Systems design, manufacture and test to IS09001 :2000 standard.
The only regular ~aintenance required is occasional de-scaling.
In common with all water boiler manufacturers, service calls resulting from
limescale are not covered by warranty. Fitting a scale reducer is recommended,
especially in hard water areas. This can reduce the build-up of scale but may not
stop it altogether.
A service agent should descale the machine regularly. The frequency that
descaling is required depends on the local water supply; hard water areas need
more attention. Marco suggest that the machine be descaled every 3 months if the
unit is in a hard water area. In soft water environments every 6 months should
suffice.
CLEANING:
POURING
PERFECTION
Lil,e any :-:ooking utensils the coffee urns of your Filtro Shuttle must be cleaned
properly
8,.,rj regularly. Marco recommend cleaning after each days brewing using a
ProPI;etar . urn-cleansing compound.
MareI'
u", -::Ieans~"r(Marco Part number 8000240) is available in 800g tubs.
Instn'st... ., are givt:n~n each tub.
The e\ renul of these machines may be cleaned with a damp cloth and a light
dete'
]8;'1 Do not use abrasive cloths or creams, as this will spoil the finish of the
machh:; Do not use a water jet or spray. Beware of accidentally operating the
draw off
t"JP when cleaning the front of the machine.
URNS:
The
Ftro Shuttle is designed to accommodate the Marco urn
Parr
nurnl-,e: 1700174 Insulated Urn 6L Shuttle
INSTRUCTIONS FOR MODELS
FILTRO SHUTTLE 5.6~(VJ
(PIN: 1000650)
FILTRO SHUTTLE 2.8kW'
(PIN: 1000651)
Water Pressure: 5 - 50 psi (min.-max.)35 - 345 kPa (min.-max.;
Water Flow Rate: 1.5Litres per minute minimum
r
! MARCO h~::11
1509001 :2IJ!J,;
Registered
Cornpar,y
(i)
~ ~~(.'\~~ooo~
CE
Marco Beverage Systems Limited.
63d Heather Road,
Sandyford Industrial Estate,
Dublin 18
Ireland Tel: +353 (0)1 2952674
lieland Fax: +353 (0)1 2953715
email: sa1es@marco.ie
www.f!11Jr;;o.ie
Marco Beverage Systems Limite::!.
Shire House, Strixton Manor
Strixton, Wellingborough. No:than:;;
NN29 7PA
________________ J
UK Tel: +44 (0)2072 744 577 ;
UK Fax: +44 (0)2079 788 141
email: sales@rnarcc-hp.v ..:.- Jk
www.marco-bev.co.uk
--- -- -~.-. --_ ..."...-------
Instructkp :iU·:'i 2;1Filtro Shuttle 29-J3-07.doc
Page 8 of 8
I 1.,_. __--
Question and Answer IconNeed help?

Do you have a question about the Marco FILTRO SHUTTLE 5.6kW and is the answer not in the manual?

Summary

Maintenance and Cleaning

Descaling Procedures

Details on descaling frequency based on water hardness and recommended intervals.

Daily Cleaning Instructions

Guidance on proper cleaning of coffee urns and exterior surfaces using specific compounds.

Urn Compatibility

Information on accommodating the Marco urn and its part number.

Model Information

Filtro Shuttle 5.6 kW

Details for the 5.6kW model, including part number.

Filtro Shuttle 2.8 kW

Details for the 2.8kW model, including part number.

Safety Warnings and Troubleshooting

Flooding and Plumbing Hazards

Warnings about flooding risks during brewing and proper plumbing installation.

Scalding and Electrical Safety

Precautions regarding hot water dispensing and electrical installation requirements.

General Service and Maintenance Precautions

Emphasis on following manufacturer instructions for safe operation and maintenance.

Diagnostic Flash Codes

Explanation of the electronic diagnostic system and error flash sequences.

Low Water Pressure Troubleshooting

Specific guidance for 2 and 6 flash errors related to low water pressure.

Installation and Setup Procedures

Electrical Installation Requirements

Specific electrical connections for 2.8kW and 5.6kW models.

Plumbing Installation Steps

Instructions for connecting water supply, including pressure and flow rate.

Initial Start-up Sequence

Steps from initial checks to the machine being ready to brew.

Machine Operation Overview

Heat Fill Cycle Explained

Description of the standard heat-fill cycle for water heating.

Brew Readiness Indicator

How the Ready To Brew LED indicates the machine is ready for brewing.

Control Panel Functions

Overview of control panel LEDs, Lock function, and brew selection buttons.

Brewing Coffee Guide

Filter Paper and Coffee Preparation

Instructions for preparing the filter paper and adding ground coffee.

Urn Placement for Brewing

Ensuring correct urn alignment for optimal coffee decanting.

Brew Selection and Timing

How to select half or full brew and expected brewing times.

Marco FILTRO SHUTTLE 5.6kW Specifications

General IconGeneral
BrandMarco
ModelFILTRO SHUTTLE 5.6kW
CategoryCoffee Maker
LanguageEnglish

Related product manuals