Installation, Operation & Maintenance Manual - PS-121B / PSH-141A
5
Installation
Choosing The Right Location
Your installation location should meet the following
requirements:
• Make sure that you install your unit on an even
surface to minimize noise and vibration.
• The unit must be installed near a grounded
plug, and the Collection Tray Drain (found on
the back of the unit) must be accessible.
• The unit should be located at least 30cm (12”)
from the nearest wall to ensure proper air
conditioning.
• DO NOT cover the Intakes, Outlets or Remote
Signal Receptor of the unit, as this could cause
damage to the unit.
Note About Fluorinated Gases
• This air-conditioning unit is a hermetically sealed unit that contains fluorinated gases.
For specific information on the type of gas and the amount, please refer to the relevant
label on the unit itself.
• Installation, service, maintenance and repair of this unit must be performed by a
certified technician.
• Product un-installation and recycling must be performed by a certified technician.
• If the system has a leak-detection system installed, it must be checked for leaks at least
every 12 months.
• When the unit is checked for leaks, proper record-keeping of all checks is strongly
recommended.
NOTE:
All the illustrations in the manual are for explanation purpose only. Your machine may be
slightly different. The actual shape shall prevail. The unit can be controlled by the unit
control panel alone or with the remote controller. This manual does not include Remote
Controller Operations, see the <<Remote Controller Instruction>> packed with the unit for
details.