33. Fasten the SMV retainer bracket to the fender with the provided 1/4" x 1" step bolts and
flange nuts provided. It will be necessary to bend the sign bracket in order to orient it
vertically.
34. Remove factory floormat.
35. Taken the main cab floormat and place onto operator foot platform. Ensure there is good
clearance for all pedals and levers. Use the provided fir tree fasteners and install floormat onto
platform. Notch and cut the rubber as necessary if any clearance issues pop up.
June 2021© Massey GC1705 ROPS Cab Installation Manual