Users’ Guide for Earth Ground Resistance Tester
Description
MAX: Maximum
MIN: Minimum
AV G : Average
REL: Relative measurement
READ: Data reading
MEMO: Data is being put into a memory
USED: There are data in memories.
2POLE: Bi-pole method is being used for measurement of resistance.
3POLE: Ti-pole method is being used for measurement of resistance.
V: Volt(voltage)
KΩ: Ohm(resistance)
: Auto power-off has been started with the symbol on
: Battery is low with the symbol on
: For socket identification
: Alternating current
: For warnings and cautions
-9-