Before using the system to bathe individuals the operator must be trained by a qualified trainer or completed the
online video training.
General:
Before operating the Integrity Bath System, familiarize
yourself with the key features of the tub and transporter
components highlighted in the drawings supplied with
these instructions.
1. Fill the Reservoir
Make sure the Reservoir Fill Lever is in the closed
position. While holding the shower wand with the
spray directed towards the inside of the tub, turn the
Shower Control Valve on by rotating it counte
r
cl
ockwise until it stops. Adjust the Fill Temperature
of the water by rotating the Mixing Valve to the hot
or cold side as needed to obtain the desire
d
Temperature while monitoring the fill temperature
dial on the Reservoir. The desired temperature for
bathing is normally set between 96° _& 105°. The
mixing valve on the system is preset to prevent mixe
d
wa
ter from exceeding 110°. It is recommended that
you always test the temperature of the water on your
wrist to make sure it is comfortable and safe for the
individual. Turn off the Shower Control Valve when
you have achieved the desired temperature
and
re
turn the shower wand to the shower hose guide..
Caution: Do not only turn off the black switch on
shower wand; the valve must be turned off to avoid
back pressure build up.
WARNING: The temperature of the bath water
must never exceed 110°. If you are unable to
adjust to the normal level of 100° to 105°,
remove the individual and report the problem
to maintenance. Do not use bath until the
mixing valve is serviced to correct the problem.
Failure to heed this warning could result in a
scalding injury to the individual.
Next, turn the Reservoir Fill Valve on by rotating it
counter clockwise until it stops. The water will shut
off automatically when the reservoir is full. Monitor
the bath temperature dial on the Reservoir while
Reservoir is full. When the reservoir stops filling, you
can go get the individual for bathing.
CAUTION: Do not leave the Reservoir full after the
last bath of the day, Reservoir / Tub Fill Lever should
be in the open position.
IMPORTANT SAFETY INSTRUCTIONS READ AND
FOLLOW ALL INSTRUCTIONS THROUGHLY
CAUTION: The caution heading identifies
important maintenance and operation
information. Failure to obey a caution warning
may result in damage to the Integrity Tub or
Transporter and may void the warranty
Open/Close
Arm
Panel
Valve
Reservoir Fill
On/Off Valve
Door Latch Release
Button