291
/
2023 OWNER’S MANUAL
guide, and note that the two
widest buckles wrap around
the surf tow point. With the
outside straps in place,
the rest will line up where
they mount.
5. Move to the aft end of the
shade. Stretch the canvas
aft so that the metal rings
can be mounted on the
tension poles.
6. Mount the metal rings around the tension
poles. Pull the tension pole slightly
towards you to make mounting the metal
ring easier. After mounting the metal ring
on the tension pole, release the tension on
the pole slowly so that it returns to a
vertical position.
7. Adjust the buckles as
necessary to ensure that
the shade is taught, but not
putting undue stress on the
tension poles.
Speaker Cover
Protects the speakers from weather
and insects