EasyManua.ls Logo

Maytag iQ Drive R6GI User Manual

Maytag iQ Drive R6GI
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
20 SEER / 81% AFUE
Multi-Stage, Variable Speed, Inverter Driven System with Gas Heating / Electric Cooling
R6GI / PPG2GI
Premium Model Shown
INSTALLATION INSTRUCTIONS
DO NOT DESTROY THIS MANUAL. KEEP IN A SAFE PLACE FOR FUTURE REFERENCE.
FIRE OR EXPLOSION HAZARD
• Failuretofollowsafetywarningsexactlycould
result in serious injury or property damage.
• Installationandservicemustbeperformed
by a qualified installer, service agency or the
gas supplier.
Do not store or use gasoline or other
flammable vapors and liquids in the vicinity
ofthisoranyotherappliance.
WHAT TO DO IF YOU SMELL GAS
• Donottrytolightanyappliance.
• Donottouchanyelectricalswitch;donotuse
any phone in your building.
• Leavethebuildingimmediately.
• Immediately call your gas supplier from a
neighbor’s phone. Follow the gas supplier’s
instructions.
• Ifyoucannotreachyourgassupplier,callthe
fire department.
RISQUE D’INCENDIE OU D’ EXPLOSION
Le non-respect des avertissements de
sécurité pourrait entraîner des blessures
graves, la mort ou des dommages matériels.
L’installation et l’entretien doivent être
effectués par un installateur qualié, un
organismede serviceou le fournisseurde
gazstaller, service agency or the gas supplier.
•Nepasentreposerniutiliserdel’essenceni
d’autres vapeurs ou liquides inflammables
dans le voisinage de cet appareil, ni de tout
autre appareil.
QUE FAIRE S’IL Y A UNE ODEUR DE GAZ
•Nepastenterd’allumeraucunappareil.
•Netoucheràaucuninterrupteurélectrique;
n’utiliser aucun téléphone dans le bâtiment.
•Évacuerl’immeubleimmédiatement.
•Appeler immédiatement le fournisseur de
gaz en employant le téléphone d’un voisin.
Respecter à la lettre les instructions du
fournisseurdegaz.
•Sipersonnenerépond,appelerleservicedes
incendies.
WARNING:
AVERTISSEMENT

Table of Contents

Questions and Answers:

Maytag iQ Drive R6GI Specifications

General IconGeneral
BrandMaytag
ModeliQ Drive R6GI
CategoryFreezer
LanguageEnglish

Summary

Installation Instructions: Initial Safety

Fire and Explosion Hazard Warnings

Critical warnings about gas leaks, flammable vapors, and safe practices.

Gas Leak Detection and Response

Steps to take if a gas smell is detected, emphasizing immediate evacuation and contacting authorities.

Critical Safety Information

Electrical Hazard Warnings

Precautions regarding electrical shock, fire, and explosion hazards during installation and service.

R-410A Refrigerant Handling

Guidelines for handling R-410A refrigerant, emphasizing professional service and avoiding homeowner intervention.

Regulatory Requirements and Codes

Combustion Air and Ventilation Codes

Guidelines for ensuring adequate combustion air supply and ventilation per codes.

Unit General Information and Placement

Combustion Air and Venting Requirements

Carbon Monoxide Poisoning Hazard

Warnings and procedures to prevent carbon monoxide poisoning related to venting system operation.

Vent Termination Location Guidelines

Specifications for proper vent termination location to ensure safe exhaust discharge.

Circulating Air Supply and Ductwork

Preventing Combustion Product Contamination

Safety measures to prevent combustion products from entering the return air or circulating air supply.

Electrical Wiring and Connections

Electrical Wiring Safety Procedures

Warnings and essential steps before servicing electrical components for safety.

Line Voltage and Grounding

Proper line voltage supply, circuit protection, and grounding procedures for safe operation.

Thermostat Configuration and Airflow

Gas Supply and Piping Installation

Gas Supply Safety and Leak Testing

Critical warnings about gas supply safety, including leak testing procedures and what to do if a leak is detected.

Altitude and LP Gas Conversion

Procedures and warnings for converting the unit for high altitude or propane gas operation.

Startup and Adjustment Procedures

Operating Sequences and Maintenance

Cleaning Procedures

Troubleshooting and Diagnostics

Operating Instructions

Electrical Information and Interface

System Wiring Diagrams

Wiring Diagram for 2-4 Ton Models

Detailed electrical wiring diagram for 2, 3, and 4 Ton package units.

Wiring Diagram for 5 Ton Models

Detailed electrical wiring diagram for the 5 Ton package unit.

Refrigerant Charging and System Performance

Refrigerant Charging Guidelines

Safety warnings and instructions for charging the unit with R-410A refrigerant.

Installation and Performance Checklist

Pre-Installation and System Checks

A comprehensive checklist for installers to verify proper installation and system readiness.

Related product manuals