a. Fix the Right Lower Cable (74) to the Right Sliding Adjustment Frame (18) using 1 x M10×25mm Allen
Bolt (61), 2 × Ø10mm Washers (69) and 1 x M10 Aircraft Nut (70).
b. Put the Ø97 Pulley (39) on the Right Lower Cable (74), and fix to the Right Slant Base Frame (3) and
Main Base Frame (7) using 1 x M10×45mm Allen Bolt (64), 1 × Ø10mm Washer (69) and 1 x M10
Aircraft Nut (70).
c. Put the Ø97 Pulley (39) on the Right Lower Cable (74), and fix the Pulley Level Bracket (40), Level
Bracket Bushing (41) and Double Floating Pulley Bracket (22) to the Ø97 Pulley (39) using 1 x
M10×50mm Allen Bolt (65), 2 × Ø10mm Washers (69) and 1 x M10 Aircraft Nut (70). Please note that
the Level Bracket Bush (41) and Right Lower Cable (74) should be embedded into the Pulley Level
Bracket (40).