EasyManua.ls Logo

Merc-O-Tronics 98 - Co Check Condenser for Proper Grounding; Timing

Default Icon
132 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1.
2.
TO
CHECK CONDENSER FOR PROPER
GROUNDING
Connect small
black test lead
to
stator
plate.
Connect small red test
lead to
bodv
of
condenser.
Point
B
see
illus-
tration
FiS.
16.
Read
Scale No.
2.
The meter
pointer
must be in
the
"OK"
band.
If meter
pointer
reads
in the
high resistance band
this indicates that
the
condenser
is
not
properly
grounded
to
plate.
Check
points
in the
same
manner.
3.
4.
5.
6.
T
IMING
CONDENSER
CONNECT
PRIMARY
WIRE
TO CORE AS SHOWN. BE
SURE SCREW
IS TIGHT.
SMALL
RED
TEST
LEAD
CONDENSER
SINGLE RED-}
LEAD NOT
USED
SMALL
BLACK
TEST
LEAD
Figure
l7
BEFORE
TIMING
Preliminary to
timing
motor,
set
the breaker
points
to the manuf acturer' s
specifications.
Use
a
feeler
gauge --
don't
guess.
Be sure
the breaker
rubbing
block is
on
the highest
part
ofthe
cam
when setting
points. (Refer
to
"Breaker
Point Test",
preceding.)
Lubricate
the
cam oiler wick of
the breaker
arm with
fibre
grease (as
specified by
manufacturers).
Be
sure
the
moveable arm is
free
on
pun
and lubricate
pivot pin
with
fibre
grease.
Be
sure
all
screws are
tight and that all wires
are
in their
proper place.
TIMING
Remove
paper
from
between
breaker
points
and
clean
points
before
test.
DO NOT
FILE.
Connect
small black
test lead to the stator
plate,
frame.
Connect
small
red lead
to the
breaker
point
terminal
screw.
1.
2.
3.
l6