Installation
 Page 126 
2. Open and fix the position of the panel 
Firstly,  unscrew the two screws showed in the picture 
below, then open the panel, and fix the position of the 
panel by the latch.  
3. Use the holder in the mounting plate to prop up the 
unit, giving you enough room to connect the refrigerant 
piping, signal cable, and drain hose.
Step 3. Connect drain hose and refrigerant piping (refer to 
Refrigerant Piping Connection section of this manual for 
instructions).
 Step 4. Keep pipe connection point exposed to perform 
the leak test (refer to Electrical Checks and Leak Checks 
section of this manual). 
Step 5. After the leak test, wrap the connection point with 
insulation tape. 
Step 6. Remove the bracket or wedge that is propping 
with insulation tape. 
Step 7. Using even pressure, push down on the bottom 
half of the unit. Keep pushing down until the unit snaps 
onto the hooks along the bottom of the mounting plate.