EasyManua.ls Logo

Midea YL1633S - Install Water Bottle; Provide Electricity; Activate Heating & Cooling

Midea YL1633S
9 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Install water bole
1. Open cabinet door.
2. Place probe assembly on probe hanger.
3. Place fresh bole outside of cabinet.
4. Remove enre plasc cap from top of bole.
5. Clean outside of new bole with a cloth.
6. Place probe into bole.
7. Slide collar down unl it clicks in place.
8. Push head down unl tube hits boom of
bole.
9. Slide bole into cabinet and close door.
Provide Electricity
Plug cord into a properly grounded wall outlet.
At this me the pump will begin to move water
from the bole to the hot and cold tanks. It will
take up to 12 minutes to fill the tanks for the rst
me. During this period the pump will run
connuously. This is normal.
Acvate Heang & Cooling
Noce: This unit will not dispense hot or cold water unl the switches
are acvated.
To acvate, push top side of power switches in to start heang and cooling
water.
- If you do not want to heat water, push boom side of red switch in.
- If you do not want to cool water, push boom side of green switch in.
4

Related product manuals