25
Chapter 4 - Installation
Startup checklist
The enclosed startup checklist guides the process of the machine installation and
checkout. The startup checklist forms must be completed and sent to Milltronics Mfg. to
activate the machine warranty. Use the startup checklist in conjunction with the
following outline when installing and setting up the machine.
Required Assembly
In some cases, parts of the machine are removed or adjusted for shipping purposes.
Qualified personnel (See the safety checklist on page 2 for qualifications) should install
and adjust as necessary according to the photos and descriptions.
Locate the leveling pads and bolts. Thread them into the
machine base before setting the machine on the floor.
A block of wood is used to support the head
during transportation. Once the homing process
begins, the head will move upward so the support
block can be removed. When pressure is
relieved from the block it can safely be removed.
On RH30 machines, the front panel / operator station is rotated beyond the stop position
and out of the way. Instructions are included that explain how to position the operator
station and install the stop bolt in the correct location.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Milltronics RH Series and is the answer not in the manual?

Milltronics RH Series Specifications

General IconGeneral
BrandMilltronics
ModelRH Series
CategoryControl Systems
LanguageEnglish

Related product manuals