© Mitsubishi Forklift Trucks 2013. All
© Mitsubishi Forklift Trucks 2013. All rights reserved.rights reserved. Revision: BRevision: B
Document ID: 615023Document ID: 615023
55 (244)55 (244)
PBV20N2 PBV20N2 Service Service ManualManual
3.3. Wet the new wheel shaft bolt Wet the new wheel shaft bolt withwith
Loctite 243.Loctite 243.
4.4. Install the new wheel shaft bolt.Install the new wheel shaft bolt.
5.5. Tighten the new wheel shaft bolt.Tighten the new wheel shaft bolt.
The correct tightening torque isThe correct tightening torque is
27 Nm.27 Nm.
5.9.2 5.9.2 Assembly Assembly of of the the traction traction wheelwheel
1.1. Align the rim’Align the rim’s hole pattern s hole pattern with thewith the
wheel shaft bolts and slide thewheel shaft bolts and slide the
traction wheel into place.traction wheel into place.
2.2. Install the five rounded cone nutsInstall the five rounded cone nuts
and tighten them. The correctand tighten them. The correct
tightening torque for the nuts istightening torque for the nuts is
80 Nm.80 Nm.