3. UNPACKING
This machine is completely assembled and perfectly adjusted before packing in the
crate. Careful handling is important to assure maximum performance of the grinder.
A sudden shock to or tipping over of the machine can be a serious reason to
deteriorate accuracy of the machine. Such careless treatment causes variations
in the minutely adjusted parts and thus reduces the perfect precision. Be
extremely cautious throughout entire courses of unpacking and setting up.
F
V
After bringing in the machine
to the installation site, un-
pack the crate.
1. Remove the top and sides of
the crate.
2. Remove the three bolts locking
the machine to crate floor,
and separate it from the crate.
3. Lift up the machine by hanging
it with nylon slings or steel
wires hooked at the eye bolts.
Always lift from the center.
If the lifting point is off
the center, the machine might
be tipped over.
4. It is also important to put
some rags or cushioning material
between the machine surface
and the ropes or wires for the
protection of the machine.
5. Before lowering the machine.
screw in 3 leveling jackbolts
enclosed in the same crate
(Parts No.17) from above
(Fie. 3)
— 5