WATER SYSTEM SETUP PROCEDURE.
It is imperative that the water delivery to the deck oven is checked.
NOTE. DYNAMIC PRESSURE, NOT STATIC, IS BEING MEASURED.
(SEE DRAWING ON NEXT PAGE)
1. Flush out the main feed pipe to be used until water runs clear and free from debris.
2. Connect main feed to oven.
3. Place a container under the test valve.
4. Slowly open drain valve and set the regulator to 0.5bar using the screw underneath.
5. When the pressure has stabilised shut the test valve.
REPEAT 3, 4 AND 5 AT THE END OF INSTALLATION.