19
83.Alignthetrimpanel'sretainingclipstotheopenings
intheliftgate,handtaparoundtheperimeterofthe
uppertrimpanel(1)toengagetheretainingclips.
84.Installthepushpinfasteners(1)totheuppertrimpanel
(2).Repeatfortheoppositeside.
NOTE:Thesidetrimpanelscanbeinstalledincon
junctionwiththelowerliftgatetrimpanel.
85.Positionthelowertrimpanel(1)andconnectthe
wiringharnesstotheliftgatelamp(2).
Feb02,2011K6861161