Rev. 00 of 01.01.2009 6 / 29
7 āPRESSURE AND VACUUM RELIEF VALVES 16
8 -TEST AND RUN-IN 18
8.1 TEST 18
8.2 RUN-IN 18
9 -START-UP, OPERATION, STOP 19
9.1 START-UP 19
9.2 OPERATION 19
9.3 STOP 19
9.4 CONTROL DEVICES 19
9.5 PROTECTION DEVICES USED 20
9.6 PERSONAL PROTECTION DEVICES TO BE USED 20
10 -TROUBLESHOOTING 21
11 -MAINTENANCE, TESTS, REPAIRS, TECHNICAL SERVICE 22
11.1 CLEANING 22
11.1.1 WASHING OF BODY 22
11.1.2 WASHING OF OIL TANK 22
11.1.3 WASHING AND CLEANING OF VALVES 22
11.2 VALVES CHECK 22
11.3 INSPECTION AND REPLACEMENT OF THE VANES 22
11.3.1 FEATURES OF THE VANES 22
11.3.2 INSPECTION OF THE VANES 23
11.3.3 REPLACEMENT OF THE VANES 24
11.3.4 DIMENSIONS OF VANES (NEW) 24
11.4 REPLACEMENT OF THE RUBBER CHECK BALL 24
11.5 REPLACEMENT OF THE GEARS 24
11.6 TECHNICAL SERVICE 24
11.7 PERIODIC MAINTENANCE 24
12 -DECOMMISSIONING AND DEMOLITION 25
COMPANY CERTIFICATION IN COMPLIANCE WITH THE REQUIREMENTS OF THE STANDARD UNI EN
ISO 9001:2000 26
DECLARATION OF THE MANUFACTURER 27